Green Diamond Performance Materials

Production Reporting Transformation

Current manual workflow vs. AI-powered operations platform
1

Operator Data Entry (Access 2010)

Operators log shift data into the Access QC Management database: uptime/downtime percentages per shift (Day/Swing/Night), tank levels, feed rates, production rates, equipment settings. 3 shifts x 5 days = 15 entries per plant per week.

Runs on Access 2010 compatibility mode - unsupported on modern versions
~15 min/shift
2

QC Sieve Analysis Entry

QC operators run 3-4 sieve tests per day, entering particle size distributions across 10 mesh sizes with spec compliance checking. ~15,000-20,000 entries per year across all plants. Results logged separately from production data.

QC results disconnected from production settings - no automated feedback loop
~10 min/test
3

Monday Data Pull

Operations manager exports last week's data from Access database. Navigates through individual entries using InfoMode button, copies values manually into the 2025 WW & WD Production Report Excel workbook (66 tabs).

Must click through ~25 different input sources to assemble one week's view
2-3 hrs/week
4

Percentage-to-Hours Conversion

Excel formulas convert shift percentages to minutes (% x 0.01 x 479), then to hours (/60). Sums across all shifts for weekly totals across 8 downtime categories: PRO, SCH, USM, USP, SMT, WEA, OTR, SUT/SDT.

Manual formula maintenance across 66 tabs - any formula break goes unnoticed
Built into Excel
5

TPH and Tonnage Calculation

Average TPH rates per stacker (1-5 + County) multiplied by uptime hours to derive weekly production. Green boxes in Excel = manual entries from other reports. Cross-referencing belt scale data, inventory measurements, and production logs.

Green (manual entry) cells require data from outside the database
1-2 hrs/week
6

Monthly Rollup and KPIV Tracking

Weekly data aggregated into monthly report tabs. KPIV tracking for Crusher (target 180 TPH), Polydeck (130), Hydrosorts (110), Feed Loader (250). Median calculations, chart generation, comparison against targets.

Last two weeks of each month consumed by report preparation
4-5 hrs/month
7

Department Presentations

Operators present monthly performance to management and team members. Each department prepares their own section. Data must be formatted for presentation outside of the Excel report.

1 hour per department per month for review meetings
1 hr/dept/mo
8

Annual Reset

At year end, the entire 66-tab workbook is duplicated and reset for the new year. All weekly tabs cleared, formulas preserved, new year headers updated. YTD tabs reset.

"That level of work is frustrating" - Brandon L.
2-3 hrs
30+
Hours per month across 3-4 people
66
Excel tabs maintained manually
0
Real-time visibility into operations
25+
Click-throughs to find one data point
Fully Automated
AI-Assisted + Human Confirmation
Human Decision Point
1

Modernized Operator Data Entry

Web-based forms replace Access 2010. Same familiar data points, cleaner interface. Tablet/desktop optimized. Auto-saves, validates entries in real-time, flags missing or inconsistent data before submission. Guided downtime categorization with definitions and examples.

Same workflow, modern platform - no retraining needed
~10 min/shift
2

Integrated QC Sieve Entry with Live Feedback

Sieve tests entered in same platform. Instant spec compliance visualization. When results drift out of spec, automatic notification sent to hydrosort operator with current settings context. Historical comparison: "Last time this happened, adjustment X corrected it."

Closes the QC-to-production feedback loop from hours to minutes
~8 min/test
3

Automatic Calculation Engine

The moment data is entered, all calculations fire automatically. Percentage-to-hours conversion (x 0.01 x 479 / 60), weekly aggregation across all shifts, tonnage derivation (TPH x uptime hours), KPIV tracking against targets. Zero manual Excel work.

Replaces the entire 66-tab Excel workbook with real-time computation
Instant
4

Live Operations Dashboard

Real-time view of all four plants: tank levels, production rates, uptime/downtime, current shift performance. Color-coded status indicators. KPIV gauges showing Crusher, Polydeck, Hydrosorts, and Feed Loader performance against targets (180, 130, 110, 250 TPH).

Available to operators, supervisors, management, and ownership - role-based views
Always on
5

Automated Weekly/Monthly/YTD Reports

Reports generate themselves from live data. Weekly production summaries, monthly rollups with trend charts, YTD comparisons. KPIV medians and trend analysis. Exportable to PDF. Emailed to leadership on schedule. Formatted for presentation.

Eliminates 30+ hours/month of manual report assembly
Auto-generated
6

Anomaly Detection and Alerts

System monitors production metrics against historical baselines. Flags unusual downtime patterns, TPH drops, spec failures. Alerts sent to relevant personnel. "Stacker 2 TPH dropped below 40 for the first time in 3 weeks - investigate?"

Proactive instead of reactive - catch problems before they compound
Real-time
7

Human Decision Points (Preserved)

Operators still make the judgment calls: hydrosort pressure adjustments, blend decisions, feed assessments. The system captures every decision with context and outcomes, building an institutional knowledge base over time.

Expertise stays with the people - the system makes it measurable and transferable
As needed
8

Capacity Planning and Scenario Modeling (Phase 2)

Historical production data feeds a capacity model. "If we grow turf sand by 20%, what does that require from the wet plant?" What-if simulator using actual production rates, current utilization, and sales projections. Click-of-a-button scenario analysis.

Turns production data into a strategic planning tool for growth decisions
On demand
<5
Hours per month for reporting oversight
1
Unified platform replaces Access + Excel
24/7
Real-time visibility into all operations
1
Click to see any data point, any time range
Process Area Current AI-Powered Impact
Data entry platform Access 2010 (unsupported) Cloud web app Eliminates platform risk
Weekly report generation 2-3 hrs manual Excel work Automatic, instant ~10 hrs/month saved
Monthly rollup and KPIV 4-5 hrs across departments Auto-generated with trends ~5 hrs/month saved
Presentation preparation 1 hr per dept per month Pre-built dashboards, exportable ~4 hrs/month saved
Historical analysis Click through 25+ entries manually Search, filter, visualize in seconds Hours to seconds
QC-to-production feedback Manual, delayed communication Instant alerts with context Faster quality corrections
Downtime pattern visibility Only visible after monthly assembly Real-time trend monitoring Proactive maintenance
Capacity planning Manual Excel model, limited scenarios What-if simulator with live data Strategic growth tool
Knowledge continuity Concentrated in key personnel Codified in system with audit trail Succession-ready / PE value
Annual workbook reset 2-3 hours, error-prone Continuous, no resets Eliminated entirely
Total monthly time savings 30+ hours/month <5 hours/month ~25+ hours/month freed
~$70K
Annual labor savings (30 hrs/mo x $45/hr blended x 50 wks)
5%+
Potential revenue impact from capacity visibility ($1.3M+ at $26M)
4 Plants
Unified on one platform (West Dry, Wet, Ball, East)
PE Ready
Tangible operational IP for future exit valuation